SYSTEM SETUP

EPLANT-Piping System Setup is used as a Template to create a New Project and to set specific global parameters, such as the Language used by the System Interface.

System Setup (3min 7sec)

 

PROJECT SETUP

EPLANT-Piping Project Setup allows to specify at the Project level most of the configurable parameters used in a project, such as Formats, Rules, and more. A detailed description of each available option is given below.

Project Setup - Default Standards (3min 36sec) Default Dimensional Standard and Project Symbology

Project Setup - Material Codes (3min 34sec) To enable Custom Material Codes generation

Project Setup - 3D Models: Defaults (3min 29sec) To manage 3D Models basic defaults

Project Setup - 3D Models: Colors (47sec)

Project Setup - Tolerances (2min 55sec)

Project Setup - Measurement Units (1min 4sec)

Project Setup - General Formats (2min 3sec)

Project Setup - General Options 1 (3min 9sec) Such as: Language used in Reports, Schedule and Insulation options and more.

Project Setup - General Options 2 (3min 47sec) Such as: Disable Project Setup changes from graphic, Enable Out of Specifications and more.

Project Setup - Requisition Options (2min 21sec) Options available in Material Requisitons Generation.

Project Setup - Joints (53sec) To set up Welding Codes.

Project Setup - 2D Plan Extraction (1min 10sec)

Project Setup - Elbows/Thorus/Cones (35sec) Controls Wire Frame resolution.

Project Setup - Line Number Format (2min 42sec)

 

FLUID AND COLOR TABLE

If in the Project Setup 3D Models: Colors option, the Piping Component Color is set By Fluid the corresponding table is enabled.

Fluid and Color Table - Change Piping Colors in 3D (1min 53sec) Already in Basic Tutorial

 

LINES / EQUIPMENTS STATUS

For changing the Status while working in the 3D Models, refer to EPLANT-Piping Basic Tutorial / PIPING COMPONENTS / Line Utilities / Modify Status.

Lines / Equipments Status Setup (3min 53sec)

 

PCF SETTINGS

PCF Settings (5min 44sec)

 

P&ID LINK

For basic concepts Refer to EPLANT-Piping Basic Tutorial / PROJECT / P&ID LInk.

The link between Equipments and Piping Lines is automatically established using the Equipment Name and the Line Name. For any other objects (Valves, Instruments, etc.) look the following video for detail:

P&ID Link - System Component Codes (1min 48sec)

Although the best way to integrate P&IDs is to use EPLANT-P&IDs, this integration can also be simulated, for example when the Diagrams are already drawn:

P&ID Link - P&ID Simulation (7min 5sec)

 

P&ID CONSISTENCY CHECKING

Checking information between 3D Models and PI&D is straithforward and will spot any inconsistency between them.

P&ID Consistency Checking (3min 41sec) Already in Basic Tutorial

 

Last updated September 26th, 2020.